- Site wide 12.47kV protection coordination & programming (2012)
- Provided site wide 12.47kV protection coordination and programing by modelling the existing distribution and new equipment in SKM, Establishing new protection curves for proper device coordination and programming new & existing S&C Vista switchgear for protection curves.
- Detailed design for 15kV electrical distribution upgrade Phase 1 including installation
of new (3) 15kV Vista switchgear. - Detailed design of 600V electrical distribution including underground cabling, gang operated switch, transformer and panel board specifications.
- Arc Flash Study using SKM software.